Zonguldak Eren Thermic Energy Plant (ZETES1)

zetes-1
  • Client: Eren Enerji A.Ş. - LİD Enerji
  • Capacity: 1 x 160 MW
  • Place: Zonguldak
  • Operating Pressure: 135 Bar
  • Operating Temperature: 535˚C
  • Fuel Type: Coal
  • Completion Date: 2014
  • Project Scope:

1) Boiler Rehabilitation Procedures, New gas channels’ for Boiler’s Manufacturing and Mounting, First and Second Unit Boiler’s Membrane Walls, Pipes and connecting elements rehabilitation procedures

  • Mechanical scope
  • Disassembly
  • Material procuration
  • Manufacturing
  • Mounting

 

2) Rotary Air Heater (Luvo/RAH) Trays

  • Mechanical scope
  • Disassembly
  • Detailed Engineering and Manufacturing Pictures
  • Manufacturing
  • Mounting

 

3) Alteration of Ash Catcher

  • Mechanical scope
  • Material procuration
  • Mounting